Hi All
I have a project , which i make all my expression into variable. For example i have expression like below :-
sum(sales)
I create variable = vSalesSum
So that when i change the expression , all my expression which is using vSalesSum will be changes.
Now i have 100 variable in my project. and i like to create a new project , which i load by binary load :-
Binary 'lib://vFOLDER_/000_QVD_V8023.qvw';
After load all the data from above script , i need to copy the 100 variable to this new project.
Does any one have any idea how to copy them ?
Alternative i can using my master project which have 60 sheet , what i can do is delete all 60 sheet , and save as new project name. this is very manual , i hope some one can share with me it there a faster way.
Paul